Bridge Girder and Frame Analysis for
Joliet Aerial Cable Pull 

Meade analyzed the existing 1933 bridge girders and frames to determine if the structure would be adequate for the additional loads from the aerial cables. Advanced steel and finite element analysis were utilized to verify the built up girders and members capacities.